The construction on the new Women’s Center building is almost completed.


The bathroom fixtures, wall tiling and doors have been installed …


as have the wooden doors to the kitchen.


The tiling has also been completed on the built-in pila and preparation area outside the kitchen.

The windows have all been installed, the floors painted, and all the lighting and electrical outlets installed.