Construction; Progress Report #8
A few days ago the construction crew planned the entire day for pouring the concrete floor. Because they need to pour the entire floor without a break, the Women’s Group offered to make lunch for the crew.
They began early in the day, and by the time the men stopped for lunch, they had created a “tipico” lunch of fried chicken pieces, rice, a potato vegetable salad and lots of tortillas, with cups of cold horchata (rice milk) to drink.